Performing a Pressure Test

When to perform a Pressure Test

If a pressure test is required, it should be performed prior to installing the check valve assembly tubing connections.

 

How to Perform Pressure Test

1. Cap the Injector with the ¾” pipe cap provided for the pressure test.

2. Check inside the DEL AOP S and all plumbing fittings for leaks.

3. Repair any leaks before continuing installation.