Performing a Pressure Test
When to perform a Pressure Test
If a pressure test is required, it should be performed prior to installing the check valve assembly tubing connections.
How to Perform Pressure Test
1. Cap the Injector with the ¾” pipe cap provided for the pressure test.
2. Check inside the DEL AOP S and all plumbing fittings for leaks.
3. Repair any leaks before continuing installation.