Before you begin, review the plumbing requirements below:

  • Water inlet is 1.5″ PVC socket
  • Power inlet is 1.5″ conduit socket
  • Water depth must be between 2″-12″
  • Beach entry slope must not exceed 1/12 grade to keep plume perpendicular with water surface

POST & LEVEL THE UNIT

First, post and level the bubbler unit.

INSTALL PLUMBING

Install the plumbing using PVC glue.

Make sure screws are tight.

  • Pressure test all pipe fittings according to your local building codes
  • Bubbler is shipped ready to pressure test

INSTALL CONDUIT

Next, install the conduit.

A minimum of one (1) 1.5″ × 90° sweep is required.

After this, you can use a 1″ conduit to the junction box.